6 Hot Trends in Cold Storage Warehouse Construction

Views: 279   No Comments  

by:

6 Hot Trends in Cold Storage Warehouse Construction

At Stellar, we construct a lot of cold storage facilities and distribution centers. In fact, over the years we’ve designed and built more than 10 million square feet of public refrigerated warehouse space.

My point? We notice patterns in consumer demand, common challenges and external factors that influence the market as a whole.

Here are six of the top things affecting the cold storage construction industry right now.

 

How to Keep Your Food Plant Construction Project on Track

Views: 142   No Comments  

by:

How to Keep Your Food Plant Construction Project on Track

Technology and ever-increasing consumer demand are driving food and beverage companies to compete at a different level than ever before. Speed to market is increasingly important to doing business — the faster a new plant can be built or renovated, the sooner it can begin producing a return on investment.

So how can you ensure your next construction project stays on track? Let’s look at five ways to set yourself up for success, whether you’re tackling a greenfield project or a retrofit.

 

Back to the Basics: How to Optimize Your Clean-in-Place System

Views: 192   No Comments  

by:

Back to the Basics: How to Optimize Your Clean-in-Place System

A number of food manufacturing facilities have been utilizing clean-in-place (CIP) for years. It’s the method of cleaning processing equipment and piping without disassembling it. While most of us already know what CIP is, when was the last time you performed a thorough audit of your system?

Over the years, changes to the systems being cleaned may have caused the CIP system set-point ratios to change without notice to the operators — making it more out of whack than you may realize.

 

6 Points, One Stone: How Low-Impact Development (LID) Can Help Achieve LEED Certification

Views: 160   No Comments  

by:

6 Points, One Stone: How Low-Impact Development (LID) Can Help Achieve LEED Certification

If you’re not familiar with low-impact development (LID), you may want to keep reading before building your next facility or warehouse. Thanks to recent changes in LEED requirements, we’re going to see an increase in projects utilizing LID in the near future.

What exactly is low-impact development? How can you make the most of LID and maximize it when applying for LEED certification? Let’s unpack what it means for your next project.

 

Food Plant Sanitation: Choosing Flooring, Walls, Ceilings and Doors to Improve Food Safety

Views: 391   No Comments  

by:

Food Plant Sanitation: Choosing Flooring, Walls, Ceilings and Doors to Improve Food Safety

Whether you’re designing a new food and beverage facility or renovating an existing one, it’s important to consider the materials you choose for to surround your processing — literally.

When it comes to food safety, these features sometimes get less attention than other factors — such as equipment, ingredient storage/segregation and product handling — but they can be a plant’s Achilles heel if ignored.

Today, we’re going to look at the best practices when selecting materials for your facility’s flooring, walls, ceilings and doors.

 

A Cost Segregation Study Can Save Thousands on Your Next Facility Renovation or Construction Project

Views: 198   No Comments  

by:

A Cost Segregation Study Can Save Thousands on Your Next Facility Renovation or Construction Project

Renovating an older food manufacturing facility, or building a new one altogether, is a complex process with a lot of moving parts. You need to vet firms and contractors, navigate design decisions, select materials, choose equipment, consider the possibility of future expansion…the list goes on and on.

Like with any investment, there are always ways to cut costs based on what options you select for your facility — but what if you could reap savings off the top, regardless of what materials and equipment you choose? With a cost segregation study, you can.

 

The Pros and Cons of Your Facility Location with Stricter LEED v4 Criteria

3 site selection credits that are now harder to earn in LEED v4

Views: 306   No Comments  

by:

The Pros and Cons of Facility Location with Stricter LEED v4 Criteria

When it comes to earning LEED certification, the location of your building plays a major role. After all, site selection accounts for 26 out of a possible 110 credits under LEED v4 New Construction — that’s more than halfway to the 50 credits required to achieve LEED Silver status.

A variety of factors determine whether your site is eligible for certain credits. Many times, simply looking 10 feet beyond the city limit and into county land can make a dramatic difference in cost or eligibility to earn certain credits.

Urban sites offer many “given” points that don’t require site modifications, such as access to public transit, but property near a city center is often more expensive. On the other hand, “paid” points that involve investing in site modifications — such as Sustainable Sites credits — realistically require a larger piece of land, which is often hard to find near a downtown area.

 

Preventing Allergen Control Failures and Labeling Mistakes

How to avoid the biggest cause of food recalls in 2017

Views: 361   No Comments  

by:

Preventing Allergen Control Failures and Labeling Mistakes

There were a total of 440 recalls of FDA and USDA regulated food products in 2017.

The single leading cause of recalls last year? The presence of undeclared allergens and the misbranding of products.

A total of 218 recalls (nearly half of the total) were announced because a product contained ingredients that weren’t declared on the label, such as:

 

[Infographic] 7 Best Practices for Gluten-Free Manufacturing

Views: 1488   No Comments  

by:

[Infographic] 7 Best Practices for Gluten-Free Manufacturing

The demand for gluten-free products isn’t just a passing trend. In fact, the gluten-free foods market is projected to be valued at $7.59 billion by 2020. Plus, researchers have noted a rise in celiac disease rates in recent years — just more evidence that the need for GF products isn’t going anywhere anytime soon. Before you begin producing gluten-free products in your facility, however, consider these principles to ensure you cater to this growing market safely, efficiently and effectively.

 

Understanding LEED v4’s Energy and Water Use Prerequisites and Credits

What you need to know about v4’s focus on energy efficiency, as well as new credits to consider pursuing for your project

Views: 453   No Comments  

by:

Understanding LEED v4’s Energy and Water Use Prerequisites and Credits

When it comes to green building, LEED v4 is the new standard. As of October 31, 2016, the United States Green Building Council (USGBC) will only accept new LEED registrations under LEED v4. Although the registration date was extended, the last day projects can submit for v3 certification — the sunset date — is still June 30, 2021.

The latest version of the LEED rating system features more rigorous standards, and while some of the credits and prerequisites are essentially the same as the 2009 version, there are some significant changes.

I outlined those changes in a previous post, but now let’s take a closer look at some of the new prerequisites and credits ushered in by LEED v4, specifically those involving energy use and environmental impact.